What Should Be Included in Solar Project Handover? (22 อ่าน)
22 ต.ค. 2569 18:20
Commissioning is an important milestone, but the quality of handover affects how easily a plant can be operated and maintained.
Industrial buyers should receive approved drawings, equipment records, test reports, warranties, operating manuals and monitoring access. Training and clear procedures for reporting faults are also valuable.
For UVIE Solar and other solar EPC contractors, these requirements should be agreed in the contract and verified during handover of ground mounted solar projects.